Alexium Brings Advanced Phase Change Material Solutions to Data Center Construction & Building Material Applications

News originally published by

EIN Presswire

Advanced suite of microencapsulated PCM including Micronal, gives data center designers enhanced thermal buffer in walls, ceilings and modular panels.

Alexium International Group Limited (ASX:AJX)

GREER, SC, UNITED STATES, October 6, 2026 /EINPresswire.com/ -- Alexium International Group Limited (ASX: AJX), a specialty chemistry company delivering advanced thermal management and flame retardant technologies, today announced that microencapsulated phase change material (mPCM) solutions are available to U.S. data center developers, design-build contractors and engineering firms as a passive thermal buffer built into the facility itself. Offering 3 unique microencapsulation technologies under NexTek, VivTek, and Micronal brands, Alexium offers formulated coatings made with these microcapsules at various melt points dependent upon the thermal requirements of the project/application.

Micronal was originally engineered by BASF for gypsum board and plaster and backed by two decades of use in commercial buildings, Micronal joined Alexium's portfolio with the December 2025 acquisition of Microtek Laboratories and is now manufactured in the United States.
Alongside the launch, Alexium is opening a co-development program for PCM-based thermal energy storage aimed at the ride-through and peak-load challenges of AI-era facilities.

As rack densities climb, the minutes after a cooling failure have become a design problem. Schneider Electric's analysis of temperature rise during a cooling outage found that a dense data hall can climb roughly 5 °C per minute and exceed acceptable limits within about five minutes, before chillers can restart. Electrical, uninterruptible power supply (UPS) and battery rooms must hold their temperature through the same event, and daily load swings in support spaces force HVAC to be sized for peaks it rarely sees. Consulting engineers at Cundall wrote in July 2026 that thermal storage is the most effective ride-through provision available to designers.

Alexium mPCMs transform ordinary wallboard, plaster, aerated concrete, ceiling cassettes, architectural coatings into latent thermal mass. Each microcapsule holds a proprietary core inside a cross-linked shell, small enough to mix into the building material without changing how it is installed. When room air climbs past the PCM's melt point, the core melts and absorbs heat; when the space cools, it re-solidifies and releases it.
As an example, single 15 mm gypsum board loaded with 3 kg/m² of Micronal® stores about 330 kJ/m² at its switching point — the heat-storage capacity of roughly 9 cm of concrete — and hangs on standard furring with standard screws. The capsules have been tested through 10,000 thermal cycles, equivalent to about 30 years of daily use, with no notable change in performance.

Alexium mPCMs are a finite buffer: storing heat rather than removing it, slowing and blunting a room's temperature rise and recharging once cooling returns. The solutions are designed to work alongside chilled-water storage and UPS-backed fans and pumps, not to replace them.
Alexium is positioning mPCMs for three places on a data center campus:
• Support spaces. In electrical, UPS, battery and telecom rooms, network operations centers and offices, PCM board and plaster at a 23–26 °C switching point flatten daily peaks and hold a tighter temperature band through an outage, so mechanical systems can be sized closer to average load than peak.
• Data hall walls and ceilings. A grade specified just above the cold-aisle setpoint — for example 26–28 °C for a 24 °C setpoint — stays charged in normal operation and adds latent capacity that slows the climb toward the ASHRAE allowable limit when cooling is lost, buying time for chiller restart.
• Prefabricated, modular and edge facilities. Lightweight panel construction has almost no thermal mass. A 15 mm mPCM board gives a factory-built module the heat-storage capacity of 9 cm of concrete without the weight or freight.

Alexium is also inviting developers, MEP firms, cooling and thermal-storage OEMs, and board and ceiling manufacturers into a co-development program. Supplied in various forms, the mPCM solutions can be formulated into slurries, plates, and cassettes at custom melt points for active thermal storage; research published by SINTEF indicates PCM storage can be up to four times more compact than equivalent water tanks. Alexium's broader microencapsulated PCM portfolio spans melt points from 6°C to 43°C.

"The data center industry is asking a building-materials question — how can active temperature management solutions help minimize peak energy demand during extreme daily temperature swings," said Billy Blackburn, CEO and Managing Director of Alexium. "Alexium’s suite of PCMs are designed to meet these challenges and now vertically integrated for global manufacturing & distribution. We're putting it in front of the developers, engineers and manufacturers who are building the data center & AI campuses of the next decade."

"Our microencapsulation platform is what lets us tune the melt point to the room — a 26°C grade for a data hall envelope, a custom point for a chilled-water loop," said Randall Lane, Alexium COO. "That's the conversation we want to have with engineers and OEMs now, while these facilities are still on the drawing board."

Technical data, published test references and the Alexium mPCM data center technical briefs are available at alexiuminternational.com or by contacting Alexium at (803) 715-3641 or info@alexiuminternational.com.

About Alexium International
Alexium International Group Limited (ASX: AJX) develops and manufactures specialty chemistries for advanced thermal management and flame retardancy, including microencapsulated phase change materials (mPCM), formulated coatings, and flame retardant treatments for bedding, textiles, foam, building products and adjacent markets. Through its subsidiary Microtek Laboratories, Alexium is a global leader in PCM and microencapsulation technology and the manufacturer of Micronal® PCM for building materials. Learn more at alexiuminternational.com and microteklabs.com.

Taylor Jones
Alexium International
+1 843-442-7477
email us here
Visit us on social media:
LinkedIn

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Canadian Business Today

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.